View Single Post
  #1 (permalink)  
Old 01-14-2008, 09:07 PM
Steve's Avatar
Steve Steve is offline
Engineer
 
Join Date: Jul 2006
Location: USA
Posts: 728
First structure for new layout

Having decided to start my new layout after the holidays, it was a perfect time to start looking at possible structures that will go on it. One industry I needed was a grain elevator.

In the course of tossing ideas back and forth with a good friend and excellent scratch-builder (I was showing him kits, he was showing me prototype pics), he found this:
Wollenberg Elevator

For more pics and drawings you can go here:
Historic American Buildings Survey/Historic American Engineering Record (HABS/HAER) (American Memory from the Library of Congress) Type "wollenberg grain" in the search box.

After seeing "Wollenberg" I wanted to scratch-build it, but.............I DIDN'T KNOW HOW!!!!

long story short.....He did the drawings, I did the rest (after pestering him with loads of questions)

Here ya go:


















I used Campbells corrugated metal for the roof panels and sandpaper for the tarpaper roof, and added Tichy windows and doors.
__________________
Steve
The modeler formerly known as Nazgul
Reply With Quote